  1. Procedure

    To replace, service, remove a valve, valve bank, solenoid and or solenoid plunger, use the following procedure. A Philips screw driver is the only tool you will need.

  2. Remove Splash Panel

    Next, remove the splash panel to access the valves.

    Reference "Nozzle Cover" in the Installation section.

  3. Round Spindles (White Tabs)

    Look for the round spindles (white tabs) located on the bottom of the valve; there is 1 per valve that controls the flow to both the top and bottom flow controls in line with the spindle. Locate the specific valve(s) you are servicing and push up on the spindle to stop the flow of syrup or water.

  4. Black Tabs

    Locate the specific valve(s) you are servicing and push up on the spindle to stop the flow of syrup or water. When you push up on the white tab you will see a black tab pop up on the top indicating that the syrup or water is shut off.

  5. Access Valve Purge

    Enter the service UI screen using the password 3333. In the Unit Setup screen, select Valve Purge.

  6. Valve Layout

    The valve layout on the Valve Purge screen has the same layout as the physical valves.

    If you were to lay the Valve Purge screen over the valves, you can easily identify each valve. For example, valve CW1 is the 6th valve from the left on the top.

  7. Activate Valve

    Once the spindles are pushed up, you will activate the valve through the valve purge screen. This will relieve the pressure between the backblock and the valve bank, as well as ensure that you have shutoff the correct valve.

  8. Select Valve

    In the Valve Purge screen, select the valve(s) you are servicing. You should see only a few drops. If you have a steady stream this indicates that you do not have the correct spindle shutoff.

    Once you relieve the pressure, tap the valve again to deactivate. You can stay in this screen as you will need it at the end of the procedure.

  9. Release Valve Bank

    Once the round spindles are pushed up and the valves are purged to relieve pressure, push the black dovetails (between the white spindles) up to release the entire valve bank from the back block.

    Note: You do NOT have to remove the MFV module all the way out of the machine to service the valve, solenoid or solenoid plunger. The following slides will show the valve removed. This is to provide a better view.

  10. Remove Retaining Clip

    First, remove the silver retaining clip (one per valve) by prying up on the stainless steel valve locking clip.

  11. Remove Valve Module

    To remove the valve module, pull the front of the valve up, then rotate the valve upwards to remove it from the carrier.

    Note: O-rings tend to stick in the valve bank. Make sure to place both o-rings back onto the valve prior to re-installation.

  12. Remove Solenoid

    To remove the solenoid, rotate the solenoid counter- clockwise and remove it to service the solenoid, plunger tip, and spring. Make note of coil and wire routing so they can be placed back into their original orientation (especially the rear coil wire).

    Caution: Remove solenoid and plunger assembly carefully so the spring is not bent or lost.

  13. Access Plunger Tip and Spring

    You can now access the plunger tip and spring.

    Water Plunger Tip (Black) PN: 620056892W

    Syrup Plunger Tip (Tan) PN: 620711132

  14. Re-insert Solenoid

    Insert the solenoid back into the valve and rotate it a ¼ turn to the right to lock it in place. Ensure the coils and wires are in their original orientation.

    Note: The sticker on the front solenoid should face the right. The sticker on the back solenoid should face the left.

  15. Re-install Module

    To re-install the module, place the valve into the valve carrier.

  16. Valve Flange Fitment

    Start inserting the valve at a 45° angle and ensure that the square section of the rear flange of the valve fits behind the wall of the carrier.

  17. Seat O-Rings

    Push the dual-barbed outlet fitting to the front of the carrier. Then push the valve back and down into the outlet fitting. Make sure that the bottom red o-rings seat fully into outlet fitting ports and are not pinched in the outlet barbs.

    We recommend replacing o-rings (PN: 620059773) and lubricating them with Dow Molykote 111.

    Note: Quad rings are black, but older units may have red rings.

  18. Insert Locking Clip

    At this point, the valve should be back in position and ready for the stainless steel locking clip to be inserted.

  19. Complete MFV Installation

    Complete the MFV valve installation by following this procedure:

    Place the MFV valve on the backblock. Make sure wires are not pinched.

    Push down on the dove tails to lock the valve.

    Push the spindles down to open the shut-offs.

    Re-connect the wire harness (if needed).

    Check for leaks by activating the modified valves through the valve purge function.

  20. Solenoid Values

    Solenoid Coil Ohm and Voltage Values:

    9.1 Ohms +/- 10%

    Initial Solenoid activation voltage – 30 VDC